Descargar Imprimir esta página

arjo Enterprise ENT-ACC05 Instrucciones De Uso página 8

Publicidad

Operation (3 steps)
1. Fit the pulley clamps J to the fracture frame and attach traction cords and weights as
required (Fig. 8).
8
2. Two additional sockets K are provided on the head end bow to attach other accessories
such as IV poles (Fig. 9). Do not install a lifting pole in these sockets.
9
K
3. To adjust the height of the lifting handle above the bed, press the button on the side of the
handle and adjust the strap to the required length (Fig. 10).
10
J
EN

Publicidad

loading