Descargar Imprimir esta página

SMA EV CHARGER 7.4 Manual De Operación página 43

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology AG
7.3
Changing the Network Configuration
After you connect to the user interface for the first time (see Section 8.1, page 44), the welcome
page opens.
On the welcome page, you can change the network configuration. The automatic network
configuration recommended by SMA Solar Technology AG via DHCP server is activated by
default. Only change the network configurations if the default configuration is not suitable for your
network.
Procedure:
1. Select Change network configuration on the welcome page.
2. Carry out network configuration and confirm with [Save].
7.4
Configuring the Product
After you connect to the user interface for the first time, the welcome page opens.
If you click on [Next], the commissioning assistant starts. With the commissioning assistant, you can
create an administrator account to access and configure the product.
Limitation of the maximum charging power password-protected by the
installer possible
The maximum charging power of the charging station can be limited by the installer with
password protection as part of the commissioning process. In particular, the limitation of the
maximum charging power of the EVC22-3AC-10 to 11 kVA is possible. In this case, the
consent of the grid operator for the use of the charging station is not required in accordance
with Section 19 (2) NAV. A subsequent increase of the maximum charging power by the user
is excluded by the rights and roles concept. The change in the maximum charging power
(WMaxIn) is documented and visualized in the internal event log of the charging station and
in Sunny Portal.
Procedure:
1. Click on [Next] on the welcome page.
2. Enter the administrator account data and click on [Next]. Observe that only 1 user with
administrator authorization can be created.
☑ The administrator account has been created.
3. Follow the steps of the commissioning assistant and configure your system accordingly. For
every setting made in a step, click on [Next].
☑ When all steps are completed, the information page is displayed.
4. To open the user interface home page and view product data, click on [Next].
Operating manual
7 Commissioning
EVCxx-10-BE-en-11
43

Publicidad

loading

Este manual también es adecuado para:

Ev charger 22Evc7.4-1ac-10Evc22-3ac-10