Descargar Imprimir esta página

Vaisala PR53AC Guia De Instalacion página 14

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 91
3. Weld the ferrule into the process pipeline.
For the optimal self-cleaning properties, install the refractometer in a 10 °
downwards angle.
/
a2
10°
mm [in]
If your system must comply with EHEDG, 3-A or other sanitary standard, see
the standard for more detailed welding instructions.
4. Install the gasket.
If your system must comply with the EHEDG sanitary standard, use a gasket
that complies with the current version of the EHEDG Position Paper.
14
M212866EN-B

Publicidad

loading