SERVICING
To carry out this operation, proceed as follows.
Close the gas supply tap.
1)
Pull off the knobs (A).
2)
Undo the screws (C) and remove the control
3)
panel (B).
Undo the screw (D) of the pressure test point.
4)
Connect the pressure gauge (E) to the pres-
5)
sure test point (F).
Open again the gas supply tap.
6)
Light the burner and turn the knobs to the full
7)
fl ame setting, then check that the pressure
reading complies with the values in the table
(see at the end of the manual).
Turn off the burner, disconnect the pressure
8)
gauge.
Restore the initial conditions after completing
9)
the operation.
HANDLING AND INSTALLATION
INSTRUCTIONS AND WARNINGS FOR HANDLING AND INSTALLATION
NOTE: Read the following sections
carefully before performing any handling
and installation operations; read the
following sections of the "User instruction
manual":
– Hazards and safety provisions during trans-
port.
– Hazards and safety provisions during assem-
bly.
– Hazards and safety provisions during installa-
tion, commissioning, adjustments and part re-
placement
WARNING: All handling and installa-
tion operations shall be carried out in accor-
dance with current legislation on health and
safety at work.
3329590_inst_GB_rev.2
CHECKING THE GAS PRESSURE
If necessary, the person authorised to car-
ry out these operations should organise a
"safety plan" to protect the people directly
involved.
(water, electricity, and gas) must be set up
exclusively by suitably qualifi ed staff , in ac-
cordance with local requirements.
WARNING: The required connections
ENGLISH
7