Descargar Imprimir esta página

Erreka AEP10-009 Manual Del Instalador página 48

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

SET-UP
1
NECESSARY TOOLS
Set of screwdrivers
Marker pencil
Tape measure
2
INITIAL CONDITIONS AND CHECKS
Initial installation conditions
Ensure the operator is correctly installed in the
gate.
Environmental conditions
This device is not suitable for installation in
inflammable or explosive environments.
Electrical power supply installation
Ensure the current connection and installation
fulfil the following requirements:
• The nominal voltage of the installation must
coincide with that of the control panel.
• The installation must be able to support the
power consumed by all the automatic
operation devices.
• The installation must be earthed.
44
Installation manual
Electric drill and broaches
Use the electrical drill in line with the use
instructions.
It is necessary to have an earthed 230Vac
current connection.
Check that the admissible environmental
temperature range for the control panel is
suitable for the location.
• The electrical installation must comply with
low voltage regulations.
• The installation elements must be properly
secured and in a good state of conservation.
• The current connection point must be high
enough to be out of the reach of children.
If the electrical installation does not comply
with the foregoing requirements, repair before
installing the automatic operation device.

Publicidad

loading

Este manual también es adecuado para:

Aep10top9