Descargar Imprimir esta página

WIKA DPGS40TA Manual De Instrucciones página 29

Manómetro diferencial con microswitch, con prueba de componentes
Ocultar thumbs Ver también para DPGS40TA:

Publicidad

Idiomas disponibles

Idiomas disponibles

7. Options and accessories
Specifications for handling
Sequence of operations to start measurement
1. Open the pressure compensating valve (middle valve spindle)
2. Open the shut-off valve for the negative media chamber (⊖, right-hand valve)
and the positive media chamber (⊕, left-hand valve)
3. Close the pressure compensating valve
Sequence of operations to flush/vent the measuring lines
1. Start: Open the shut-off valve for the ⊕ and ⊖ media chamber, open the
pressure compensating valve and vent valve
2. Finish: Close the pressure compensating valve and vent valve
Sequence of operations to finish measurement (also temporary shutdown)
1. Open the pressure compensating valve
2. Close the shut-off valve for the ⊕ and ⊖ media chamber
Sequence of operations to dismount the measuring instrument with a running
process
1. Close the shut-off valve for the ⊕ and ⊖ media chamber
2. Open the vent valve
7.2 Panel mounting flange
For aluminium measuring chamber
Panel
3
3
WIKA operating instructions DPGS40TA with component testing
For stainless steel measuring chamber
3
3
Panel
EN
29

Publicidad

loading