Custom Schedules - Pentair VS2 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 82
11
SPEED 1 is set to begin at 8:00am and run at 3000 RPM for
a duration of 2 hours. When SPEED 1 is complete the pump
immediately begins running the default SPEED 2. SPEED 2 is
factory default to 1400 RPM and will last for 10 hours. When
SPEED 2 has completed its run the pump will run SPEED 3 at
2200 RPM for a duration of two hours.
After 14 hours of run time and completing its run of SPEED
3, the pump will enter a stationary/paused state for the next
10 hours. The pump will restart at 8:00am the next morning
and cycle through the default schedule again. The pump will
continue to run in this in this manner until a custom schedule
is programmed into the drive by the user.
Note: The Start/Stop button must be pressed, and the LED
lit, for the pump to run.

Custom Schedules

To customize the run schedule for your VS2 Variable Speed
Pump, the pump must be stopped. Be sure that the Start/
Stop button LED is not illuminated.
Programming a Custom Schedule:
Note: When programming, the LED light next to the
parameter ("Speed", "Time" and "Duration") you are setting
will blink.
1. Stop the pump if it is running by pressing the Start/
Stop button.
2. Press the "1" button. The LED above the selected SPEED
will begin to blink and the "Speed" parameter LED will
blink while editing. See Figure 8.
3000
Figure 8: Setting Speed
3. Use the "+" and "-" arrows to adjust the speed in RPM
for SPEED 1.
Note: Speed is adjusted up or down by increments of
10 RPM.
4. Press the "1" button again and the display will change
to SPEED 1 start time. The "Time" parameter LED will
begin to blink. See Figure 9.
8 : 00
AM
Figure 9: Setting Start Time
5. Use the "+" and "-" arrows to adjust the daily start time
for SPEED 1.
6. Press the "1" button again and the display will change to
SPEED 1 duration. The "Duration" parameter LED will begin
to blink. See Figure 10.
2 : 00
Figure 10: Setting Duration
7. Use the "+" and "-" arrows to adjust the duration for SPEED
1 in hours and minutes.
Note: The duration parameter is adjusted in 15 minute
increments.
8. Pressing the "1" button will continue to cycle through
these parameters, but the changes are immediately saved
as they are adjusted.
9. Press the "2" button. The LED above SPEED 2 will begin
to flash and the corresponding parameter LED will flash
while editing.
10. Use the "+" and "-" arrows to adjust the speed in RPM
for SPEED 2.
11. Press the "2" button again and the display will change to
SPEED 2 duration.
Note: SPEEDs 2 and 3 do not have a start time, as they
begin their duration immediately after the previous SPEED
finishes.
12. Use the "+" and "-" arrows to adjust the duration for SPEED
2 in hours and minutes.
13. Repeat steps 9-12 to program SPEED 3 and QUICK CLEAN.
Note: Remember that the duration allowed for SPEED 3
will be limited to the remaining time in a 24 hour day. Any
time in the 24 hour day not programmed into SPEEDs 1-3,
the pump will remain in a stationary state.
[ SPEED 1 + SPEED 2 + SPEED 3 < 24 Hours ]
14. Press the Start/Stop button and ensure the LED is lit. The
pump is now on and will run the custom user-programmed

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido