Preparing For Commissioning - SMA GRID-CONNECT-BOX 12 Instrucciones De Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology AG

7 Preparing for Commissioning

Requirements:
☐ The Grid-Connect-Box must be correctly mounted (see Section 5, page 13).
☐ All cables must be correctly connected (see Section 6, page 17).
☐ All cables must be tightly enclosed by a membrane or cable feed-through in the floor of the Grid-Connect-Box.
☐ All power cables must be secured inside or outside the Grid-Connect-Box.
☐ The floor of the Grid-Connect-Box must be closed with the base plates (see Section 9.2, page 24). All seals at
the base plates must be correctly positioned.
Procedure:
1. Ensure that the power cables are secured with a strain relief.
2. Insert the kick plates and attach with the fastening screws (TX 30, torque: 12 Nm).
3. Mount the protective cover (see Section 9.5, page 26).
4. Close Grid-Connect-Box.
5. Ensure that the requirements for commissioning the Multicluster-Box are fulfilled (see Multicluster-Box operating
manual).
Operating manual
7 Preparing for Commissioning
GRID-BOX-12-3-20-BE-xx-12
21

Publicidad

Tabla de contenido
loading

Tabla de contenido