Carrying Chain Installation - HYTROL ProSort 400 Elite Manual De Instalación Y Mantenimiento

Tabla de contenido

Publicidad

SWITCH BLOCK MUST
CLEAR PROX SWITCH IN
STRAIGHT THRU POSITION
(EL BLOQUE INTERRUPTOR DEBE
SOBREPASAR EL INTERRUPTOR
PROX EN LA POSICION
RECTA HORIZONTAL)
FIGURE 9C
1/16"
PROX SWITCH
(SENSOR DE
PROXIMIDAD)
SWITCH BLOCK MUST CLEAR PROX
SWITCH IN STRAIGHT THRU POSITION
(BLOQUE INTERRUPTOR DEBE DESPEJAR SENSOR DE PROXIMIDAD
INTERRUPTOR EN POSICION RECTA HORIZONTAL)

• Carrying Chain Installation

The carrying chains are shipped on marked spools, cut to proper length for each ProSort
conveyor. Steps for installing are as follows:
1. disconnect electrical power to drive motor to prevent accidental start up.
2. Remove the plug from the motor fan guard, exposing the hex on the motor shaft. Use this
shaft to rotate the motor manually.
3. Check alignment of chain guides by using two short pieces of chain with slat/shoe assemblies
and bearings assembled to pins. This chain/slat/shoe assembly should slide freely through chain
guides in direction of travel for entire length of conveyor.
4. Install carrying chains to both sides of conveyor with pins pointed inward. make sure the
pins of each chain are directly opposite each other. It will be helpful while installing chains to
install one slat/shoe assembly every 4 feet to hold chain in
guides.
5. fasten ends of both chains with connector links as shown
in figure 9E.
6. Install slat/shoe assemblies onto the extended chain pins
on one side of conveyor – being careful to keep the beveled
face of the shoe toward the discharge end and the side with
the rubber insert toward the spur side of conveyor (See
figure 9f). Lift opposite chain out of chain guide (so chains
may be spread apart) and insert extended chain pins into
opposite end of slat/shoe assemblies.
7. After all slat/shoe assemblies are installed, tighten
carrying chains with take-up bolts at drive shaft. Be sure
drive and tail shafts are square. Retighten all drive take-up
plate mounting bolts. See figure 10A for proper slack in
chains.
8. manually crank entire carrying chain assembly through
the conveyor to see that it operates freely and nothing has
been dropped into the conveyor during installation. Also
inspect divert shoes to make sure all of them have been
installed on the correct centers. If chains are ever shortened
it must be in increments of five inches.
9. Replace motor fan guard plug.
10. Reconnect electrical power to drive motor.
FIGURE 9A
1/16"
SWITCH BLOCK
(BLOQUE INTERRUPTOR)
CARRYING
CHAIN
(CADENA)
FIGURE 9B
PROX
SWITCH
FIGURE 9D
SECTION A-A
(SECCIÓN A-A
SCALE 1 / 2
ESCALA 1/2)
SERVO MOTOR
FIGURE 9E
BEARING
(RODAMIENTO)
BUSHING
(AISLANTE)
9
SWITCH BLOCK
(NON-DIVERT POSITION)
DIVERT BLOCK
[BLOQUE INTERRUPTOR
(BLOQUE DESVIADOR)
(POSICION NO DESVIADORA)]
SWITCH BLOCK
(DIVERT POSITION)
[BLOQUE INTERRUPTOR
(POSICIÓN DESVIADORA)]
A
A
CONECTOR LINK
(enlaCe)
CARRYING
CHAIN
(Cadena)
O-RING
(O-rIng)
SLAT/SHOE ASSEMBLY
(ENSAMBLE PLACA/ZAPATO)
DIVERT SIDE
(LADO DE DESVIO)
1/16" MIN.
1/8" NORMAL
DIVERT BLOCK
(BLOQUE DESVIADOR)
RETAINER
RING
(retenedOr
de anIllO)
FIGURE 9F
FLOW
(FLUJO)

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido