Bath lighting
An applique with a 24v bulb comes with the equipment as well as the
transformer located on the generator. For large baths, request 1 or more
appliques in the order, depending on the measurements. For installation, as
many 2x1 line pipes must be installed as appliques. The pipe must go from
the machinery closet to the location of the appliques at a height of 190 cm
above the floor.
Loaction of the thermostatic probe.
The htermostatic probe is located inside the bath at a height of 160 cm from
the floor and on the wall opposite the steam output. For installation a 2x1
wire pipe is necessary fro m the location of the probe to the location of the
machinery.
Water connection
To connect the equpiment a water connection of 1/2" with a valve is
necessary, to the right of the machinery and at a height of 120 cm from the
ground.
To guarantee the proper and long-lasting opeation of the generator, the
water hardness must no exceed 4 french degrees. Conduct a water
analysis and if it is higher, an appropriate resin decalcifier must be installed
in accordance with the equipment consumption. This can be installed by a
plumer or order the equipment from our company, with an integrated
decalcifier.
Electrical connection.
The equipment must be installed with an independent line protected by a
differential and magnetothermal switch which is appropriate to power of the
equipment. The grounding connection must be done. The section of cable
and protection vary depending on the voltage of the premises. See section
and protection table on page 20.
Drain connection.
The steam equipment needs a drainage system to partially and fully
drain the impurities that accumulate in the boiler. This operation is
done by evacuating 80 degree water. Therefore the pipe installed
must be a 22 mm copper pipe approximately 3 meters in length so
that the water cools down.
If the drain is hung to a lower floor, the entire pipe should e in copper until a
vertical drain.
The drain has to be placed below the machinery equipment at floor level to
avoid siphons.
ISSUES TO KEEP IN MIND WHEN ORDERING OR DOING
Power of the steam equipment.
Indicate voltage of the home or premises.
Number of appliques for lighting.
Incorporate decalcifier in the equipment.
Incorporate an aroma pump for equipment on a lower floor.
Incorporate prefabricated white acrylic ceiling.
Incorporate prefabricated blue acrylic ceiling starry sky.
Incorporate complete glass door module.
Incorporate fixed glass modules.
Incorporate 8 color fiber optic chromo therapy lamps.
Incorporate starry sky points in the fiber optic.
Incorporate 4 aroma multiple aromatherapy device.
Incorporate stainless steel steam diffuser.
Incorporate drop valver for bath ventilation.
White, silver or stainless steel section finish
25
ESTIMATES