•
Before starting to use the burner, read the chapter "WARNING NOTES FOR THE USER: HOW TO USE THE BURNER SAFELY" in
this instruction manual carefully, which is an integral and essential part of the product.
•
Carefully read the instructions before starting or maintaining the burner.
•
Only skilled personnel is allowed to work on the burner and the system
•
Disconnect the electric power from the system before starting any operation. Wrong operations can lead to dangerous accidents.
We hereby declare under our own responsibility, that our domestic and industrial
blown air burners fired by gas, oil and dual fuel series:
BPM...; BGN...; BT...; BTG...; BTL...; TBML...; Comist...; GI...; GI...Mist;
Minicomist...; PYR...; RiNOx...; Spark...; Sparkgas...; TBG...;TBL...; TS...;
IBR...; IB...
(Variant: ... LX, with low NOx emissions)
respect the minimal regulation of the European Directives:
• 2009/142/EC
• 2004/108/EC
• 2006/95/EC
• 2006/42/EC
and have been designed and tested in accordance with the European Standards:
• EN 676 (gas and dual fuel, gas side)
• EN 267 (light oil and dual fuel, oil side)
Cento, 23 July 2013
Danger
TECHNICAL SPECIFICATIONS ....................................................................................................................................................................................... 4
GAS SUPPLY LINE .......................................................................................................................................................................................................... 7
BURNER CONNECTION TO THE BOILER ..................................................................................................................................................................... 9
ELECTRICAL CONNECTIONS ........................................................................................................................................................................................ 10
DESCRIPTION OF VALVE OPERATION ......................................................................................................................................................................... 12
FIRST FILLING UP OF PIPELINES ................................................................................................................................................................................. 13
IGNITION AND REGULATION ......................................................................................................................................................................................... 13
CONTROLS ...................................................................................................................................................................................................................... 14
MAINTENANCE ............................................................................................................................................................................................................... 17
DETAILS OF PUMPS ....................................................................................................................................................................................................... 18
WIRING DIAGRAMS ........................................................................................................................................................................................................ 23
Statement of Conformity
CE0085:
DVGW CERT GmbH, Josef-Wirmer Strasse 1-3 - 53123 Bonn (D)
(G.A.D)
(E.M.C.)
(L.V.D)
(M.D.)
R&D Manager
Eng. Paolo Bolognin
Warnings
0006081349_201307
CEO and General Manager
Dr. Riccardo Fava
aTTenTiOn
1 / 28
infOrmaTiOn