Modbus; Start-Up Procedure For The Unit - Astralpool 54068-MB Manual Tecnico

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
ASTRALPOOLHEAT SERIES · AIR/WATER SYSTEM
ASTRALPOOLHEAT SERIES · AIR/WATER SYSTEM
ASTRALPOOLHEAT SERIES · AIR/WATER SYSTEM
ASTRALPOOLHEAT SERIES · AIR/WATER SYSTEM
POOL & & & & SPA MODE
POOL
POOL
POOL
SPA MODE
SPA MODE
SPA MODE
When the unit is configured to heat Pool and Spa water, we can use both terminals, EXT #1 and
EXT #2, to gain some extra capabilities (first SPA Control screen on technical menu has to be set
to External control, see 5.7. 17).
EXT #1
EXT #2
RESULT:
The unit will work on Pool mode.
The unit will work on Spa mode
The unit will work on Pool + Spa mode
External Stop (same case as in general mode)
5.16.
5.16.
5.16.
5.16.

MODBUS

MODBUS
MODBUS
MODBUS
This Heat pump includes Modbus capabilities. For complete instructions
for Modbus connection & communication, please consult Modbus manual
at Fluidra PDB (Product Data Base):
6. 6. 6. 6. START
START- - - - UP PROCEDURE FOR THE UNIT
UP PROCEDURE FOR THE UNIT
START
START
UP PROCEDURE FOR THE UNIT
UP PROCEDURE FOR THE UNIT
Operating requirements for the heat pump:
The outdoor temperature must be higher than +5 ºC.
The heat pump is provided with a defrost thermostat that guarantees compressor
shutdown and the operation of the defrost system.
When washing the filter of the filtering pump, it is MANDATORY to turn off the heat
pump.
Before any start-up, you should check:
The correct clamping of the hydraulic connections (exchanger inlet / outlet).
The correct fastening of the electrical cables to the connection terminals. Poorly
secured terminals can cause the terminal block to heat up.
When setting-up, the electrical connections, as well as the general power supply and
voltage should be verified.
Once the unit is connected, verify the intensity absorbed by the phases and check that
the fan is operating in the correct direction.
Give power to the equipment by connecting the general power switch on the outside of
the unit. Once the unit is connected, verify the intensity absorbed by the phases.
Three-phase units have a phase control relay that guarantees the compressor is
operating in the correct direction. If the controller shows the compressor it is running
and it does not, phases must be interchanged. Card gives an alarm signal.
With the machine running, verify the intensities absorbed by the electric motors,
making sure they do not exceed the limits mentioned in the technical specification
sheet.
Verify that the currents of the different lines are not out of phase except in the case of
single-phase circuits.
High and low pressure switches should be installed in the cooling circuit and verify the
refrigerant charge (Refrigerant Charge section).
Performing the heat pump adjustments in its initial operation
© ASTRALPOOL 2015 ALL RIGHTS RESERVED. PROPRIETARY DOCUMENT
http://pdb.astralpool.com/pdb/
.
ENGLISH
ENGLISH
ENGLISH
ENGLISH
Pag: 25

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido