Installing the Test Drum
1. With the meter off, open the drum door by lifting
up the drum door tab located to the right of the test
strip slot. The drum door tab projects slightly so you
can lift it up.
Chapter 1: Understanding Your New Meter
2. Press the red release button. You MUST press the
red release button if there IS or IS NOT a test drum
in the meter.
22
ACCU-CHEK Customer Care Service Center 1-800-858-8072