Installation - RK Rose+Krieger RK Powerlift M Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7. Life phases

7.4 Installation

To install the lifting columns, there are each four M8 tappings available in the internal and
external sections.
The minimum screw-in depth is 20 mm for the initial mounting, 40 mm for repeated mounting.
40 mm = max. screw-in depth. The tightening torque is 15 Nm.
An appropriately dimensioned sub-structure must be provided to ensure a high level of stability
(see "Technical data") when placed under the specified maximum pressure and tensile forces or
torque loads.
Wear the necessary personal protective equipment (PPE) at all times during work.
54

Publicidad

Tabla de contenido
loading

Tabla de contenido