74
AVENTICS | PROFIBUS DP | R402003657–BAL–001–AG
Commissioning and operation
Table 9:
S4 switch assignment
Slider
S4.1
S4.2
S4.3
S4.4
1)
Examples
Subbases used
Example 1
Subbases for double solenoid valves
Example 2
Subbases for double solenoid valves
Example 3
Subbases for double solenoid valves
1)
You can also arrange other combinations based on your requirements.
Voltage on switch
The switch can be damaged if voltage is applied to the pins
during switching.
O
Always operate the switch in a voltage-free state!
How to assign the valve supply:
O
Using the S4 switch, assign one of the two supply voltages
U
Q1
Function
Power supply
control byte 1
Power supply
control byte 2
Power supply
control byte 3
Power supply
control byte 4
The following example combinations are available for the
assignment of the S4 switch and the supply of assembled
valves for 32 valve solenoids in Table 10.
NOTICE
or U
to each valve group (see Table 9).
Q2
Position 1 (down)
U
(external supply,
Q1
pin 2, white)
U
(external supply,
Q1
pin 2, white)
U
(external supply,
Q1
pin 2, white)
U
(external supply,
Q1
pin 2, white)
Position 2 (up)
U
(external supply,
Q2
pin 4, black)
U
(external supply,
Q2
pin 4, black)
U
(external supply,
Q2
pin 4, black)
U
(external supply,
Q2
pin 4, black)
Valve equipment
Double solenoid valves
Single solenoid valves
Single and double solenoid valves