Commissioning The Valve System With Profibus Dp - Aventics PROFIBUS DP Instrucciones De Servicio

Ocultar thumbs Ver también para PROFIBUS DP:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 187
AVENTICS | PROFIBUS DP | R402003657–BAL–001–AG
Table 12:
Meaning of the bits in byte 2
Bit
Value
0
0
1
1
0
1
2
0
1
3
0
1
4
0
1
5
0
6
0
7
0
7.4
Commissioning the valve system with
PROFIBUS DP
Before commissioning the system, the following steps must
have been carried out and be complete:
W
You have assembled the valve system and the bus coupler
(see "Assembling the CL03/CL03-XL with PROFIBUS DP" on
page 63).
W
You have connected the bus coupler (see "Connecting the
module electrically" on page 65).
W
You have made the switch settings and configured the
system (see "Making settings" on page 70).
W
You have configured the bus master so that it actuates the
valves correctly.
Commissioning may only be carried out by qualified
electrical or pneumatic personnel or an instructed person
under the direction and supervision of qualified personnel
(see "Personnel qualifications" on page 57).
Commissioning and operation
Condition
-
Valve supply overload
-
12.5 V < U
< 21.6 V/20.4 V
Q1
-
12.5 V < U
< 21.6 V/20.4 V
Q2
-
U
< 12.5 V
Q1
-
U
< 12.5 V
Q2
83

Publicidad

Tabla de contenido
loading

Tabla de contenido