Blower Motor Installation; Wiring The Hood With An Integral Blower - Thermador PROFESSIONAL SERIE Operating And Installation Manual

Ocultar thumbs Ver también para PROFESSIONAL SERIE:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Blower Motor Installation

Blower
SKU
Remote
a
VTR630
Remote
a
VTR1030
Remote
a
VTR1330
Inline
a
VTI610
Inline
a
VTI1010
Integral
a
VTN630
Integral
a
VTN1030
a
Indicates a letter designating the release year.
b
With blower installed.
c
20 Amp circuit breaker required when using the
VTR1330 Remote Blower with a 27'' Pro Wall Hood.
d
15 Amp circuit breaker required when using the
VTR1330 Remote Blower with a 24'' Pro Wall Hood.
Table 3: Blower & Circuit Breaker Ratings
WARNING
Cutting the plug of the blower will void the warranty or
eligibility for return or exchange.
All hoods require the choice of a Remote, Inline, or Integral
Blower. Use only THERMADOR
THERMADOR ventilation hoods. All blower models are
sold separately. See the Ventilation Planning Guide for
recommended blowers. Contact Customer Service for
additional options.
CAUTION
To reduce the risk of fire and electric shock, install this
range hood only with the blowers listed in Table 3.
All Hood models are rated for 120 VAC, using a 15 amp or
20 amp circuit breaker.
Blower selection will vary based on the volume of air that
needs to be moved and the length and location of the duct
run. For long duct runs with multiple turns and bends,
consider using a more powerful blower. For the most
efficient air- ow exhaust, use a straight run or as few
elbows as possible (refer to "Ductwork Preparation" on
page 6).
Circuit
Voltage
Current
Breaker
(AC)
(AMPS)
(AMPS)
120
4.2
15
120
5.7
15
120
8.5
c
20
120
4.2
15
120
5.7
15
120
2.7
15
120
5.4
15
®
blowers with
Integral Blower Installation Only
Integral Blower models VTN630 and VTN1030 are
integrated into the hood at the time of installation.
For complete installation instructions see the instructions
b
supplied with the blower unit.
1. The blower is attached to the hood using weld studs
provided on the mounting plate. Figure 19 displays the
weld stud locations.
d
/ 15
2. Guide the motor mounting plate over the studs.
3. Attach (4) nuts (included with hood) to the weld studs.
Tighten nuts to secure the blower to the hood.

Wiring the Hood with an Integral Blower

1/ 8
4
"
(105)
1. Remove junction box channel covering the wires (see
Figure 14 on page 11).
2. Remove circular knockouts.
Figure 19: Weld Stud Locations
1/ 4
8
" (210)
1/ 4
2
(57)
3/ 4
6
"
(171)
7/ 8
6
"
25"
(175)
(635)
Figure 20: Integral Blower Model VTN1030
7/ 8
8
"
(225)
"
English 13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ph30hsPh36hsPh48hsPh36gsPh42gsPh48gs ... Mostrar todo

Tabla de contenido