Descargar Imprimir esta página

Roger Technology CTRL Instrucciones Y Advertencias Para El Instalador página 71

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 157
1. Select the position of the barrier in relation to the gate, using parameter
the barrier installed on the right (
side).
If the installation position is changed from the right to the left, the position of the spring(s) must also
be changed.
For the correct installation, refer to the barrier installation manual.
IMPORTANT! Lubricate the pivot points with lithium based grease (EP LITIO)
2. Check that the "operator present" function is not enabled (
3. Check the spring balance setting and the mechanical stop settings.
For further information, refer to the installation manual of the barrier.
IMPORTANT! Lubricate the pivot points with lithium based grease (EP LITIO)
4. For installations with opposed barriers, connect the command signals and safety devices to the MASTER controller. See
chapter 7 for further information on installation (see fig. 20).
5. If the ACS/BA/60 detachable boom coupling system is not installed, the parameter
6. Move the barrier boom into the completely CLOSED position.
7. Press TEST (see TEST mode in paragraph 10.3) and check the command signal and safety device states. If the safety
devices are not installed, jumper the contact or disable safety device function from the relative parameter (
).
) and the boom opening/closure gate on the left (seen from the inspection hatch
IMPOSTAZIONE DI FABBRICA
FACTORY SETTING
).
>45°
45°
. The factory setting of the parameter is with
OPEN
CLOSE
<45°
must be set to
.
,
and
71

Publicidad

loading