5
Temporary installation of the side walls
STEP
Install the side wall (15) on the opposite side of the
faucet installation. Lift the wall approximately 3" above
the deck of the bathtub, push it completely against the
back wall then lower the side wall into position.
It is critical that all 3 retraction pins
engage with the X fasteners. There
should be no gap between the walls.
The side wall should now line up
Quick tip
with the front of the bathtub.
Place a level vertically
Quick tip
on the side wall. If the
wall is not straight,
make sure that the
retraction pins are
properly inserted in
the X fasteners.
With a 1/8" bit, drill holes in the side wall fastening flange
(15) at the top aligned with each stud. Only pre-drill
the flange not the studs. Then, secure the side wall
(15) with one #8 x 1¾" screw (not included) in one of the
pre-drilled holes.
IMPORTANT: HAND TIGHTEN ONLY. TEMPORARY
INSTALLATION.
5.1
Check me!
Side wall
Bathtub
5.2
Check me!
11
3
Side wall
1
15
Back wall