Switching Off; Switching On Again - Grundfos AQC-D13 Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42

11.3 Switching off

To avoid a dosing error, the device controlled must
be switched off each time the measuring system is
Caution
switched off.
Observe the installation and operating instructions of
the measuring amplifier and the device controlled!
11.3.1 Short-term stop (up to one week)
1. Close and/or switch off the device controlled.
2. Wait until the display of the measuring amplifier is at zero.
3. Switch off the electricity supply to the measuring amplifier.
4. Close the connection to the sample water inlet (E).
To protect the electrodes, do not drain the water!
Make sure that the water level in the measuring cell
Caution
is sufficiently high for the reference electrode (K) to
be immersed at least 2 cm during device stop.
11.3.2 Long-term stop
1. Close and/or switch off the device controlled.
2. Wait until the display of the measuring amplifier is at zero.
3. Switch off the electricity supply to the measuring amplifier.
4. Close the connection to the sample water inlet (E).
5. Remove the measuring electrode (J), clean and store dry.
6. Remove the reference electrode (K), and remove the pH
electrode (A) and redox electrode (B), if applicable.
Fit thread protection caps, and clean the electrodes.
7. Fit protective caps on the electrodes. The protective caps
must be filled with 3-molar potassium chloride solution.
Observe the installation and operating instructions of
Caution
the electrodes!
8. Store electrodes with protective caps in a dry place. If they are
stored for an extended period of time, it may be necessary to
add 3-molar potassium chloride solution after a while.
9. Before starting up again, and if it is very dirty, clean the whole
measuring cell. See section

11.4 Switching on again

Observe the installation and operating instructions of
Caution
the measuring amplifier and the device controlled!
11.4.1 After short-term stop
Fill the measuring cell with water.
Note
1. Open the connection to the sample water inlet (E).
2. Check the quantity of sample water.
3. Switch on the measuring amplifier.
Let the system run for at least two hours to avoid
Caution
faulty measurements and calibrations!
4. Take a reference measurement.
5. Recalibrate, if necessary. See section
parameters Cl
, ClO
, O
.
2
2
3
6. Switch on the device controlled, if applicable.
11.4.2 After long-term stop / inspection
If the measuring cell has been switched off for a long period of
time or has been emptied, for instance for inspection, is it
necessary to start up the measuring cell. See section
10.6 Checks prior to start-up
and
12. Maintenance
.
10.8 Calibrating the
10.7 Switching on
.
19

Publicidad

Tabla de contenido
loading

Tabla de contenido