PROGRAM CYCLE
Use this feature to manually operate watering programs. You can run
the entire program or start anywhere within the station sequence of
the program.
Note: Only the stations with an assigned run time in the program will
operate during the program watering cycle.
1. Turn the function dial to the
2. Select Program
,
A
3. Press the
button to select the first station of the watering
NEXT
sequence (if other than the station number displayed).
4. Press the
button to start the watering cycle. Watering will start
ON
with the selected station and will be followed by all subsequent
stations. The display will show the run time remaining for the
operating station.
Note: You may advance through the stations by pressing the
key for the next station. To terminate operation at any time, press
the
button.
OFF
5. Leave the function dial in the
manual operation is complete, then return the dial to the
position.
OFF AND RAIN DELAY
Use this feature to turn off controller operation for indefinite periods of
time (Off mode) or for a selected number of days (Rain Delay mode).
Turning Off the Controller
Turning the function dial to the
in the Off mode. After a 2-second delay, any current watering activity
will shut off and all subsequent watering program activity will be
suspended. As long as the function dial is in the
controller will remain in the Off mode. The controller clock continues
to update current time and date, and all watering program information
is retained while in the Off mode. Normal controller operation is
resumed by simply placing the function dial in any other position.
Using the Rain Delay Mode
The Rain Delay mode enables automatic watering to be delayed from
1 to 7 days. At the end of the selected delay period, the controller
resumes automatic operation. (
Operating the Controller
Program Cycle
,
or
with the
B
C
D
Program
Program Cycle
position places the controller
Rain Off
)
CONTINUED
position.
switch.
NEXT
position until the
Run
position, the
Rain Off
17