salmson SIRIUX O home Instalacion Y Puesta En Servicio página 28

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
• Align the upper shut-off device laterally.
• Complete all welding and brazing tasks.
• Flush the pipe system.
3
2
1
3
13
1
28
6
Rotating the motor head
Rotate the motor head (3+6) before installing and connecting the
pump.
• Hold the motor head (3+6) and unscrew the 4 housing s crews
(2).
CAUTION! Damage to the inner gasket!
Damage to the inner gasket leads to leaks.
• Carefully rotate the motor head (3+6) without removing it from
the pump housing (1).
• Carefully rotate the motor head (3+6).
• Observe the allowable installation position (Fig. 2) and the
direction arrow on the pump housing (1).
• Tighten the 4 housing screws (2).
Installing the pump
Observe the following points when installing the pump.
NOTE: Install pump in the return to ensure perfect functioning of
the temperature-controlled mode.
• Note the direction arrow on the pump housing (1).
• Install without tension, with glandless pump motor horizontal
(3).
• Place gaskets in the screwed connections.
• Screw on threaded pipe unions.
• Tightly screw the pump and the pipes together.
• Insulate the pump housing (1) with the thermal insulation shell
(5).
• Install non-return valves.
CAUTION! Damage to the pump!
Insufficient heat dissipation and condensation water may damage
the control module and the glandless pump motor.
• Do not thermally insulate the glandless pump motor (3).
• Ensure all condensate drain openings (13) are kept free.
02/2015

Publicidad

Tabla de contenido
loading

Tabla de contenido