Wilo Flumen OPTI-TR 20-1 Instrucciones De Instalación Y Funcionamiento página 23

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
7
6
Fig. 7: Prepare mixer
Installation and operating instructions Wilo-Flumen OPTI-TR 20-1, 28-1, 30-1, 40-1 Wilo-Flumen EXCEL-TRE 20, 30, 40
Installation and electrical connection
via the lowering device directly into the foundation. The foundation must be dimensioned
to bear this load!
CAUTION! Material damage may occur due to incorrect accessories! Due to the high re-
action forces, the mixer may only be operated with the manufacturer's accessories (low-
ering device and frame). If the mixer is ordered together with lowering device installa-
tion, the frame comes pre-assembled. If the mixer is delivered without a frame, order
the appropriate frame from customer service!
Preparatory tasks
1
Hoist
2
Lifting equipment
3
Shackle for attachment
2
4
Support
5
Pedestal for secure set-down
6
Frame
7
Cable brackets for strain relief
3
Mixer set down and horizontal.
Frame mounted on the mixer.
Lowering device mounted in basin.
Hoist with sufficient bearing capacity must be present.
4
1. Attach lifting equipment to frame with a shackle.
5
2. Version with plastic rollers: Loosen linchpins and dismantle plastic rollers and quick-re-
lease axles.
NOTICE! Retain components for further assembly.
3. Lay all connection cables and mount cable brackets.
The cable brackets fix the connection cable to the lifting equipment and prevent un-
controlled floating of the connection cable in the basin.
Mixer
TR/TRE 20
TR 28-1
TR/TRE 30
TR/TRE 40
Cable bracket clearance
550 mm (20 in)
550 mm (20 in)
750 mm (30 in)
750 mm (30 in)
en-US
23

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido