Connection Of The Three-Phase Current Motor; Connection Of The Monitoring Devices - Wilo Flumen OPTI-TR 20-1 Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6.5.2.1
Checking insulation resistance of
the motor winding
6.5.2.2
Checking resistor in the tempera-
ture sensor
6.5.2.3
Testing the resistor of the exter-
nal electrode for sealing chamber
control
6.5.3
Connection of the three-phase
current motor
6.5.4
Connection of the monitoring de-
vices
Installation and operating instructions Wilo-Flumen OPTI-TR 20-1, 28-1, 30-1, 40-1 Wilo-Flumen EXCEL-TRE 20, 30, 40
Installation and electrical connection
If the measured values differ from the specifications:
▪ Moisture may have penetrated into the motor or the connection cable.
▪ The monitoring device may be defective.
In case of failure contact customer service.
Measure insulation resistance with an insulation tester (measuring voltage = 1000 V). Ad-
here to the following values:
▪ On initial commissioning: insulation resistance may not be less than 20 MΩ.
▪ For further measurements: value must be larger than 2 MΩ.
Check resistor in the temperature sensor with an ohmmeter. The following measured values
must be complied with:
▪ Bimetallic strip: Measured value = 0 Ohm (passage).
▪ PTC sensor (positive temperature coefficient thermistor): Measured value depends on the
number of sensors installed. A PTC sensor has a cold resistance of between 20 and
100 Ohm.
– With three sensors in series, the measured value is between 60 and 300 Ohm.
– With four sensors in series, the measured value is between 80 and 400 Ohm.
Measure the resistor of the electrode with an ohmmeter. The measured value must ap-
proach "infinity". For values ≤ 30 kOhm, there is water in the oil – change the oil!
The three-phase version is supplied with bare cable ends. Connection to the mains is estab-
lished by connecting the power supply cables in the switchgear. Refer to the attached con-
nection diagram for more precise details regarding the connection. Electrical connection
must always be carried out by a qualified electrician!
NOTICE! The individual wires are designated according to the connection diagram. Do
not cut the wires! There is no additional assignment between the wiring diagram and
connection diagram.
Wiring diagram of the power connections for direct activation
Mains connection
U, V, W
PE (green-yel-
Ground
low)
Wiring diagram of the power connections for star-delta starting
Mains connection (start of winding)
U1, V1, W2
Mains connection (end of winding)
U2, V2, W2
PE (green-yel-
Ground
low)
Refer to the enclosed connection diagram for details regarding the connection and installa-
tion of the monitoring devices. Electrical connection must always be carried out by a
qualified electrician!
NOTICE! The individual wires are designated according to the connection diagram. Do
not cut the wires! There is no additional assignment between the wiring diagram and
connection diagram.
en-US
27

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido