DBI SALA 8560155 Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 61
Set-Up of the Anchor Post Davit Arm Assembly: Install the
Anchor Post/ Davit Arm Assembly starting with and following the
system assembly procedure in Section 2.1.
Step 1:
Shown in Figure 11, clamp the Davit Arm Sleeve (21)
over Section 3 of the Advanced Portable Fall Arrest
Post.
Step 2:
Install and secure the Davit Arm Sleeve (21) by
closing the sleeve around section 3 and hand
tightening the clamp knob screws (24) as shown in
Figure 11.
Step 3:
Insert the Davit Head Assembly (23) and align one of
the three 3/8 in pin holes in the Davit Arm Receiver
Tube. Using the pin (16) secure the Davit Arm into
position and to vary the offset.
Step 4:
Shown in Figure 11, secure the cable assembly (18)
to the Advanced Portable Fall Arrest Post using the
carabineer (20) provided and connecting it to the Davit
Arm Anchor Eye (17).
2.2.6 USING THE DAVIT ARM ASSEMBLY
The Davit Arm Assembly is designed with adjustable offset
and 360 degree rotation. This Davit Arm Assembly allows the
combined use of an entry/ retrieval winch and a self-retracting
lifeline (SRL).
Step 1:
Adjust the offset by pulling the pin assembly (16) and
selecting the one of three holes offered in the Davit
Arm receiver tube (22) as shown in Figure 12.
2.3 RESCUE
The Davit arm can be rotated 360 degrees in a rescue/retrieval situation so an injured worker can be moved
to a safe environment.
The Advanced Portable Fall Arrest Post must be used in a vertical position at all times to effectively rotate the
Davit Arm. The Advanced Portable Fall Arrest Post may be used as a fall arrest anchor point during a rescue
scenario. Alternative anchor points for fall protection use should be identifi ed and planned for use during a
rescue scenario.
Mounting Brackets for Winch and SRL
The mounting brackets are for use with the Davit Arm Assembly. Winches and SRL's must have a suitable
working load.
Set-up of the Mounting Brackets
The mounting brackets are bolted onto the Davit Arm Assembly when shipped from the manufacturer. The
brackets are arranged to most common Winch/ SRL confi guration. If these brackets need to be repositioned to
suit your application, remove the two bolts securing the bracket to the Davit Arm Receiver Tube (9) shown in
Figure 13, reposition to other bracket mount location and replace bolts and tighten.
WARNING:
The Adaptor Brackets for your winch or SRL must be offset to the side that the crank handle is on to
eliminate interference between the crank handle and the Davit Arm Assembly and the mounting brackets. Not following
these instructions can impair retrieval capabilities that can cause serious injury or death.
Using the Mounting Brackets
Install and use the winch and/or SRL according to manufacturer's instructions.
Proper operation and maintenance of the winch and/or SRL are critical to the safe usage of your DBI-SALA
Advanced Portable Fall Arrest Post.
Winch and SRL Operation
Shown with the accessories in Section 2.2.5 is the DBI-SALA "Basic" Man-Rated Winch available for use with
the DBI-SALA Advanced Portable Fall Arrest Post. The winch is necessary for worker positioning and rescue
situations when using the Davit Arm Assembly. The winch is available in a variety of lifeline capacities, and
lifelines are available in a variety of lengths and materials. Winches and SRL's must used and maintained in
accordance with the manufacturer's instructions, please refer to the instruction manual provided with your
winch or SRL.
Figure 10 - Anchor Post Davit Arm
9
23
20
18
25
19
16
22
26
21
8
17
24

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

856018685666918566692856669385666978567266 ... Mostrar todo

Tabla de contenido