Injector Unit Vi Sub-Assembly En; Optional Sub-Assemblies / Accessories En; Putting Into Operation - Abicor Binzel BRS-LC Instructivo De Servicio

Ocultar thumbs Ver también para BRS-LC:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BRS-LC
4.2 Injector unit VI sub-assembly
Dirt plate
1
Envelope and injector for gas nozzles
2
with nominal diameters from 13 - 19 mm
Vacuum unit VG
3
Injector unit VI sub-assembly
Fig. 3
4.3 Optional sub-assemblies / accessories
Set of clamping jaws
Milling cutter
Solenoid valve (24 V DC)
Maintenance unit
Options / accessories
Tab. 13

5 Putting into operation

Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair work, the following instructions
must be adhered to:
• Interrupt the power supply
• Interrupt the compressed-air supply.
1
8
7
6
Flow control valve for adjusting the anti-spatter fluid
4
Return to storage tank (1 litre bottle)
5
6
1 litre storage bottle with anti-spatter fluid
The milling cutter dimensions are determined based on the gas nozzle and torch geometry for an
immersion depth up to 50 mm. It can be delivered for all standard WH and robot torch versions
with nominal diameters from 13 mm to 19 mm.
ID 832.0005
To air-blast the interior of the gas nozzle during cleaning.
ID 830.0075
Consists of a filter regulator and oiler.
The maintenance unit separates solid particles from the compressed air and adds atomised oil for
lubricating the pneumatically driven components.
DANGER
5 Putting into operation
2
3
4
5
Non-return valve
7
5/2 directional valve for injection
8
unit (on - off)
EN - 8

Publicidad

Tabla de contenido
loading

Tabla de contenido