Injection Unit Vi En; Fastening The Prism En; Mounting The Milling Cutter En - Abicor Binzel BRS-LC Instructivo De Servicio

Ocultar thumbs Ver también para BRS-LC:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BRS-LC
NOTE
Program also the following during the cleaning process: "Air-blast through cable assembly". The removed
dirt is blown out from the inside.
See 4.3 Optional sub-assemblies / accessories on page EN-8
5.2 Injection unit VI
 See Fig. 4 Putting into operation on page EN-9
1 Move the torch with the gas nozzle vertically over the injector nozzle position 3 (3) and then
position 4 (4).
Immersion depth for optimum injection: approx. 1mm
The injection process is started when actuating the corresponding 5/2 directional valve.
NOTE
Inflowing compressed air sucks in the anti-spatter fluid and mixes it with the compressed air flow (Venturi
principle). Recommended waiting time: approx. 1 sec.
5.3 Fastening the prism
1
Clamping device
Fastening the prism
Fig. 5
1 Mount the prism (3) into the clamping device (1) from above.
2 Screw in the cylinder head screw (2).
5.4 Mounting the milling cutter
Clamping device
1
Mounting the milling cutter
Fig. 6
NOTE
• Only use tools with a suitable width across flats when changing the milling cutter.
3
2
Cylinder head screw
1
Milling cutter
2
Milling cutter seat - width 27 mm, milling cutter - width 17 mm.
1
2
3
Prism
2
3
Tool
3
5 Putting into operation
EN - 10