Connecting The Pneumatic System En; Operation - Abicor Binzel BRS-LC Instructivo De Servicio

Ocultar thumbs Ver también para BRS-LC:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

BRS-LC
5.9 Connecting the pneumatic system
For the supply, a compressed air hose with a min. inner width of 8mm is required; it is fastened to the
connection plate of the assembly stand by means of a screw connection (not included in the delivery). A
shut-off valve in the supply line is recommended. This allows the BRS-LC to be quickly and simply
depressurized in order to carry out any installation and maintenance work.
The maintenance station BRS-LC must remain without pressure until installation has been completed.
Fig. 11

6 Operation

NOTE
• As the BRS-LC maintenance station is integrated into a welding system, the operating instructions of
• Make sure that the BRS-LC maintenance station is operated with a front sheet only.
1 Switch on the robot control.
2 Start the welding process.
3 Stop the welding process.
WARNING
Motor
off
on
and
Clamping cylinder
loosen clamp
M
Z2
NW4 NW4
Y2
4
2
12
14
14
14
12
5
1
3
Connecting the pneumatic system
the welding components, such as welding torch and robot control system, must be observed during
operation.
Stroke cylinder
down
up
S1
Z1
NW6
NW4
NW4
Y1
4
2
14
12
12
5
1
3
6 Operation
Injector
on
off
NW4
NW4
Y3
4
2
14
12
14
12
3
5
1
NW4
6 bar
EN - 14

Publicidad

Tabla de contenido
loading

Tabla de contenido