-Press the red button of master battery to power on, all the battery modules LED light
will be on one by one from the BMS.
If all batteries LED lights blink on and then off, it means the system is working properly.
▪
Before starting any operation. Switch off the storage system.
▪
Put "OFF" all the protections contained in the electrical panel.
▪
Switch off the BMS following the instructions given above.
▪
Do not execute any electrical works on the connecting cables
▪
The battery modules are always under tension. Even if the storage systems is off, the battery
modules poles have around 48 Vdc of potential.
DANGER!
▪
Use only the provided cables that are protected from direct contacts.
▪
Do not use any metal piece of jewelry during the manipulation of the storage system.
▪
If you cannot be completely sure that you are totally isolated from the active elements of the
installation, it is highly recommended to execute electrical measures to be sure that all the parts
that will be object of manipulation have no potential (both for DC and AC).
▪
Power cable uses water-proofed AMPHENOL connectors. It must keep
pressing the LOCK BUTTON during the pull out/in of the power plug.
NOTE
Illustration 3.16. Activation of batteries cascade.
67
Installer manual ecoSMART e-system