1. Lift the waste container until the rubber flaps can be fold-
ed down.
2. Fold the rubber flap down over the suction opening.
3. Lower the waste container again.
4. Open the clamp lock belt and remove the manual suc-
tion hose with the manual suction pipe from the storage
compartment.
Flap
1
Connection for water hose
2
Manual suction hose connection
3
5. Open the flap on the desired side.
6. Insert the manual suction hose into the connection
opening and turn it (bayonet).
7. Plug in the water hose if necessary.
8. Switch on the work hydraulics (PTO).
9. Switch on the blower via the switch (control console).
10.Deactivate the seat contact switch (F4 button on the
display).
11.Work with the manual suction hose.
12.After finishing work:
a Switch off the work hydraulics.
b Activate the safety contact switch.
13.Place the suction hose with the suction pipe in the stor-
age compartment and secure with the clamp lock belt.
Top rubber flaps position
1
Note
Normal sweeping
Air intake opening
2
14.Lift the waste container and fold up the rubber flaps.
15.Lower the waste container.
38
English