3
RECEIVING THE PRODUCT AND STORAGE
3.1 Reception
On receiving the unit, check that it is undamaged, bearing in mind that it left the factory in perfect condition.
Report any signs of damage immediately to the transporter and make a note of these on the Delivery Sheet before
signing it.
The relevant sales department or the manufacturer should be informed of the extent of the damage as soon as
possible.
The Customer must draw up a written and photographic report concerning any and all significant damage.
Disposal of the packing material is the responsibility of the consignee and must be carried out in compliance with the
regulations in force in the country in which it is carried out.
3.2 Transport
The unit is sent from the factory using suitable vehicles, with correct locking in order to prevent any possibility of
movement whilst in transit by road that may damage it or cause accidents.
If there is to be trans-shipment to other vehicles to continue the journey, it is essential to adopt all necessary measures
for ensuring the correct safety conditions, with regard to the vehicles used and the anchorage, in order to prevent
damage.
If the unit is to be transported over uneven roads, the manufacturer must be informed beforehand so that suitable
measures can be taken in order to prevent damage to the unit.
If it is to be transported by container, make sure it is correctly anchored.
With reference to road, sea/ocean or air freight, refer to the ADR, IMDG, IATA codes, etc. in place at the time of
transport.
Before organising the freight, the Manufacturer shall notify the quantity and type of refrigerant filled in the machine.
Units with mildly flammable refrigerants (A2L) shall be hauled in accordance with the European
standards and regulations and the local regulations, where applicable.
We reserve the right to make changes without any prior notice.
UATYA
4P645202-1
Translation from original instructions
Packaged Rooftop
25