Preparing The Machine For Operation - Nogueira SOFT 600 Manual De Instrucciones

Distribuidoras de fertilizantes,calcáreo y semillas
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Preparing the machine for operation

Before turning on
your Soft for the first time, remove the transmission gearbox sealant and install the
breather supplied with the machine. The gearbox is sealed in order to avoid grease leaking from the
gearbox during the shipment of the machine.
IMPORTANT:
Using the gearbox without the breather can damage it.
FLOW ADJUSTMENT LEVER
In order to save space during the shipment, the Soft is shipped from the factory with the flow
adjustment lever lowered (fig.2).
Before turning on the machine, place the lever in the operating position, as described in the following
instructions:
1- Remove the wing nut A.
LEVER
SOFT 600 / 900
Remove the sealer and install the breather.
2- Lift the lever and replace wing nut A on the
opposite side.
7

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Soft 900

Tabla de contenido