Broan best PIK33 Instrucciones De Instalación página 8

Ocultar thumbs Ver también para best PIK33:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10. REMOVE THE KNOCK-OUT OPENING (INTERIOR BLOWER)
Remove the knockout on rough-in plate. See picture below.
When using P5 blower, remove the 10'' wide knockout (smaller part). If using P8 blower, remove the knockout
corresponding to the ducting installed (10'' or 14'' adapter/damper).
11. INSTALL THE DEVIATOR (INTERIOR BLOWER)
Install the deviator as shown.
NOTE: To prevent the deviator from sliding out of the rough-in plate, put some
tape on the deviator base after sliding it into the rough-in plate (provided
with the P5 and P8 blower) opening. If installed correctly, the deviator
will protrude about 1/8" above the rough-in plate.
12. INSTALL THE ADAPTER (INTERIOR BLOWER)
Using two (2) n°. 6 x 1/2'' screws provided with insert, secure the adapter to the top of the rough-in plate. Remove tape from
damper flap. Seal the adapter to the rough-in plate by using duct tape.
HD0005
CAUTION
HD0077
Removing vertical knockout opening on rough-in plate
- 8 -
HD0087
HD0006

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Best pik45

Tabla de contenido