Sensor Installation Procedure

Pre-Installation Check List
All Sensors are assembled with the final transducers and are mated to the selected
transmitter electronics prior to delivery. The transmitter is pre-programmed with the
installation parameters specific to this Sensor, therefore the installer should verify that the
transmitter serial number matches the transmitter serial number indicated on the Sensor
nameplate.
Perform the following checklist before installing the Sensor into the line:
1. Verify that the line operating conditions (flow velocity, pressure, temperature range) and
2. Verify that the transmitter electronics is paired with the serial number listed on the Sensor
3. Check the condition of any pressure taps or Thermowell ports that may be provided with
4. User must verify that fluid is compatible with construction of Sensor material.
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Liquid Quick Start
Operating Instructions, 1/2013, A5E02639182-AC
line MAOP are within the limits specified for the flowmeter.
nameplate.
the Sensor. Install block valves, Thermowell, or plugs as necessary.
WARNING
Sensor Failure
Sensor ports that are not properly sealed create the potential for injury.
User is responsible for ensuring that all Sensor ports are properly sealed.
Installing/mounting
2.4 Sensor Installation Procedure