Pressure Hazard
If repair to the instrument is attempted when it is under pressure, the potential for injury
exists.
Never attempt to loosen, remove, or disassemble process connection or instrument
housing while contents are under pressure. Restrict use and repair to qualified personnel.
Each Sensor is labeled with a flow direction arrow indicating the direction of positive (POS)
FLOW. Although the flowmeter allows bi-directional flow, this arrow simply indicates the
direction of positive flow so that the transducer cables can be installed without confusion.
Install the Sensor into the lines with careful attention to this flow direction arrow and also the
rotational orientation as described below.
Sensor Failure
if condensation is not removed from the Sensor before it is installed in the line, the potential
for injury exists.
Remove all condensation from Sensor before installing into line.
Installation of the Sensor should be installed with the lifting eyes at or near the top of the
Sensor (see figure below). Vertical installations have no restrictions since there are no
cavities or Sensor ports to collect condensate and debris.
Figure 2-3
Always use flange bolts and nuts (not supplied unless requested) that are appropriate for the
size and class of the Sensor flange. Flange Isolation kits (not supplied) should be utilized
when indicated by the facility.
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Liquid Quick Start
Operating Instructions, 1/2013, A5E02639182-AC
WARNING
WARNING
Lifting cable within 10° of vertical
Lifting Eye
Sensor Installation
Installing/mounting
2.4 Sensor Installation Procedure
Horizontal Alignment
Sensor
19

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sitrans fut1010 ip66 nema 7

Tabla de contenido