Commissioning
3.5 Transducer Installation
13. Observing the upstream and downstream orientation, attach the UP and DN cables to
30
the transducers and make snug. Attach the other ends to the UP and DN terminals of the
flowmeter (see figure below).
①
Transducer Cables Connected to Flowmeter
②
To Downstream Transducer Channel 1
③
To Upstream Transducer Channel 1
Figure 3-8
Connecting Transducers to Flowmeter
SITRANS FUH1010 Quick Start Guide
Operating Instructions, 1/2009, CQO:QSG009 Rev A