GE Profile PV970 Serie Manual Del Propietário página 18

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION - RECIRCULATING
DUCTWORK, WIRING LOCATIONS
surface. Add hood installation height determined
line. CHECK TO BE SURE THE TEMPLATE IS
LEVEL.
centerline on the template to the ceiling.
5" c enterline to wall
House Wiring
Location
WALL VENT IS 27-3/4" MIN.
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT
ABOVE THE INSTALLATION
HEIGHT
Min.
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT
Horizontal Line
HOUSE WIRING LOCATION:
the hood.
above the bottom of the hood, and within 5" of the
centerline.
Installation Instructions
Ceiling
C
L
10-1/8"
REAR WALL
MOUNTING TEMPLATE
C L
ALIGN BOTTOM EDGE
WITH PENCIL LINE
INDICATING BOTTOM
OF THE HOOD
12-1/2"
Installation Height
31-14772 Printed in Mexico
12-08 JR
STEP 1: INSTALL FRAMING FOR
HOOD SUPPORT
IMPORTANT: Framing must be capable of
supporting 100 lbs.
Centerline of
installation
space
If drywall is present, mark the screw hole locations
for the top mounting brackets. Remove the
template.
studs at the bracket location indicated on the
template.
between two wall studs at the mounting screw
location. The horizontal support must be flush
with the room side of the studs. Use cleats
behind both sides of the support to secure to wall
studs.
NOTE: 2 horizontal supports will be needed if there
is a stud located between the horizontal screw
locations (see figure).
IMPORTANT: Reinstall drywall for an even
mounting surface.
View from
rear cleats
1" x 12" min.
mounting
support
49-2000916 Rev. 0

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Profile pv976 serieProfile pv970nssProfile pv976nss

Tabla de contenido