Eaton Powerware 5125 Guia De Instalacion página 19

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

To install the rail kit(s):
NOTE If installing EBM(s), install the EBM rails (FC 6631) below the UPS rails (FC 6632).
NOTE All hardware referenced in Steps 2 through 4 are contained in the rail hardware kit.
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 1).
Front
Rail Assembly
2.
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
Place the first rail at the bottom, using positions 1 and 6 for the
front hex-head screws. If you are installing additional rails, place the
next rail four holes above the last installed screw (see Figure 2).
®
EATON Powerware
5125 (9910-P65) UPS Installation Guide for IBM
Assembly Wing Nuts
Figure 1. Adjusting the Rail Depth
®
S
Applications
INSTALLATION
Rear
5
164201638 Rev A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p65

Tabla de contenido