Eaton Powerware 5125 Guia De Instalacion página 23

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

The UPS and EBM
the rack.
10. Slide the UPS and any optional EBMs into the rack.
11. After installing the UPS chassis, secure the front of the UPS to the
rack using two hex-head screws in the top and bottom positions of
each mounting bracket (see Figure 7). Repeat for each cabinet.
UPS
Optional
EBM
®
EATON Powerware
5125 (9910-P65) UPS Installation Guide for IBM
C A U T I O N
heavy. A minimum of two people are required to lift the cabinets into
are
Figure 7. Securing the Mounting Brackets
®
Applications
INSTALLATION
Hex-Head
Screws
S
9
164201638 Rev A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p65

Tabla de contenido