Eaton Powerware 5125 Guia De Instalacion página 28

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
3.
4.
NOTE After UPS installation, ensure maximum battery runtime by configuring the UPS for
the correct number of EBMs (see "Configuration Mode" on page 28).
14
EATON Powerware
If additional EBMs are to be installed, plug the EBM cable of the
second cabinet into the battery connector on the first EBM. Repeat
for each additional EBM. Up to four EBMs may be connected to the
UPS.
Continue to the following section, "UPS Installation."
Battery Circuit
Breakers
Figure 13. Typical EBM Installation
®
5125 (9910-P65) UPS Installation Guide for IBM
Battery Circuit Breaker
®
S
Applications
164201638 Rev A
UPS Battery
Connector
EBM Cable
EBM Battery
Connectors

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p65

Tabla de contenido