Eaton Powerware 5125 Guia De Instalacion página 31

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3.
Connect isolated, normally-open, dry contacts (rated to handle
60 Vdc maximum, 30 Vac RMS maximum, and 20 mA maximum)
across the REPO device to Pin 1 and Pin 2 (see Figure 15).
Use stranded, non-shielded wiring, size 0.75 mm
(18–20 AWG).
NOTE A separate contact must simultaneously cause UPS input AC power to be removed.
4.
Reconnect the REPO connector to the REPO port.
5.
Verify that the externally-connected REPO switch is not activated to
enable power to the UPS output receptacles.
6.
Plug in the UPS and start the UPS by pressing the On button for
approximately three seconds.
7.
Activate the external REPO switch to test the REPO function.
8.
De-activate the external REPO switch and restart the UPS.
9.
Continue to the following section, "Power Connections and
Startup."
®
EATON Powerware
5125 (9910-P65) UPS Installation Guide for IBM
Pin 1
Pin 2
Figure 15. REPO Connector
®
S
Applications
164201638 Rev A
INSTALLATION
2
2
–0.5 mm
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p65

Tabla de contenido