Eaton Powerware 5125 Guia De Instalacion página 22

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
5.
6.
7.
8.
9.
8
EATON Powerware
Repeat Steps 3 and 4 for each rail.
Tighten the assembly wing nuts on all rail assemblies.
Place the UPS on a flat, stable surface with the front of the UPS
facing toward you.
Align the mounting brackets with the screw holes on the side of the
UPS and secure with the supplied #6-32
(see Figure 6).
If installing optional EBMs, repeat Steps 7 and 8 for each cabinet.
Mounting Bracket
Figure 6. Installing the Mounting Brackets
®
5125 (9910-P65) UPS Installation Guide for IBM
×
3/8" flat-head screws
®
S
Applications
164201638 Rev A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p65

Tabla de contenido