Handle Assembly - Stiga ST 526 S Uso Y Mantenimient

Quitanieves conducido de pie
Ocultar thumbs Ver también para ST 526 S:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 108
3. Remove all the unassembled 
parts from the box.
4. Remove the snow thrower from the box.
5. Dispose of the box and packaging in 
compliance with local regulations.
4.2 ASSEMBLY OF MOVEMENT AND
AUGER CONTROL CABLES
ST 526 S
Couple the cable eyelet to the 
specific opening  (fig. 5.A, fig 5.B).
NOTE The cables are already
pre-assembled on the dashboard.
ST 627 S
1. Remove the cotter pin (fig. 
5.C) from  the peg (fig. 5.D).
2. Insert the eyelet (fig. 5.E) of 
the movement control cable 
onto the peg (fig. 5.D).
3. Hook the cotter pin to lock 
the cable (fig. 5.G).
4. Hook the slot of the 
auger control cable in the
appropriate eyelet (fig. 5.B).

4.3 HANDLE ASSEMBLY

The handle is delivered with the dashboard 
already assembled. The screws for installing the 
handle on the machine, the screws for securing 
the gear control and the fasteners for attaching
the discharge chute and the gear lever and
deflector lever grips are all delivered in a separate 
package inside the box with the machine.
Install as follows:
1. Bring the two tubes at the ends of the handle 
(fig. 6.A) up to the support (fig. 6.B).
2. Insert the spacers (fig. 6.C) and align 
the holes, taking into account the 
correct diameter (smaller cavity pointing 
out, bigger cavity pointing in).
3. Insert the screws in the holes and 
secure in place with the nuts.
4.3.1 Installation of the lever grips
Screw the grips onto the threaded rod of 
the gear lever  (fig. 7.A) and the threaded 
rod of the deflector adjustment lever 
(fig. 7.B, Type ST 526 S) accordingly. 
Tighten the fixing nut.
4.4 INSTALLATION OF THE
GEAR CONTROL
1. Insert the articulated joint (fig. 8.A) of 
the gear control in the hole on the lever
(fig. 8.B) to connect it to the transmission 
and secure in place with the nut (fig. 8.C).
2. Bring the top part (fig. 8.D) of the gear 
control up to the hole on the bottom part 
of the gear lever and secure in place by 
inserting the peg (fig. 8.E) and the cotter 
pin (already on the gear lever) (fig. 8.F).
4.5 DISCHARGE CHUTE ASSEMBLY
1. Only for Type ST 627 S: disassemble the 
lid of the discharge chute rotation motor, by 
unfastening the two front screws (fig. 9.G).
2. Position the sliding ring (fig. 9.D) 
and the discharge chute (fig. 9.C) on 
the flange fitting (fig. 9.E).
3. Insert the skids (fig. 9.B) under the 
flange fitting (fig. 9.E) by matching 
up the holes on the skid with the 
holes at the bottom of the chute.
4. Insert the screws with the washers 
(fig. 9.A)in the holes and fasten.
5. Only for Type ST 627 S: re-assemble the 
lid of the discharge chute rotation motor, by 
fastening the two front screws (fig. 9.G).
4.5.1 Installation of the discharge chute
adjustment cable (ST 526 S)
The adjustment cable is designed to connect 
the discharge chute to the adjustment handle 
on the dashboard so that the operator can point
the discharge chute in the required direction.
1. Secure the worm screw unit (fig. 9.F) onto the 
support, checking the correct engagement 
of the worm screw unit with the toothed 
section on the discharge chute (fig. 9.C).
2. Engage the square section of the flexible 
cable in its seat at the bottom part of the 
handle(if not previously assembled).
3. Tighten the cable ring nut (fig. 10.B) on 
the bottom part of the handle (fig. 10.A) (if 
not previously assembled).
4.5.2 Assembly of the deflector
adjustment cable (ST 526 S)
The deflector adjustment cable is designed 
to connect the discharge chute deflector 
to the control on the dashboard so that the
operator can lift/lower the deflector so that 
it is pointing in the required direction.
EN - 6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

St 4262 pSt 4262 pbSt 5262 pbSt 5266 pbSt 627 sSt 6276 pb

Tabla de contenido