Dosing Head Overview; Dismantling The Diaphragm And Valves; 10 9.3.3 Reassembling The Diaphragm And - Grundfos DME Serie Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9.3 Perform service
Only spare parts and accessories from Grundfos
should be used for maintenance. The usage of non-
original spare parts and accessories renders any
liability for resulting damages null and void.
Further information about carrying out maintenance
can be found in the service kit catalog on our
homepage (www.grundfos.com).
Warning
Risk of chemical burns!
When dosing dangerous media,
observe the corresponding precautions
in the safety data sheets!
Wear protective clothing (gloves and
goggles) when working on the dosing
head, connections or lines!
Do not allow any chemicals to leak
from the pump. Collect and dispose of
all chemicals correctly!
Before any work to the pump, the pump
must be disconnected from the power
Caution
supply. The system must be
pressureless!

9.3.1 Dosing head overview

1
2
3
9
Fig. 27
Dosing head, exploded view (without
deaeration valve)
1
Safety diaphragm
2
Flange
3
Diaphragm
4
Valve on discharge side
5
Dosing head
6
Valve on suction side
7
Screws
8
Dosing head front plate (only PP, PVDF)
9
Drain opening
4
5
8
7
6

9.3.2 Dismantling the diaphragm and valves

Before dismantling, read section
breakage
and section
9.5 Operation with loose
dosing head screws
thoroughly.
Warning
Danger of explosion, if dosing liquid
has entered the pump housing!
If the diaphragm is possibly damaged
or if the pump was operated with
damaged or loose dosing head screws,
don't connect the pump to the power
supply!
This section refers to fig. 27.
1. Make system pressureless.
2. Empty the dosing head before maintenance and
flush it, if necessary.
3. Take suitable steps to ensure that the returning
liquid is safely collected.
4. Dismantle suction, pressure and deaeration
hoses.
5. Unscrew deaeration valve.
6. Dismantle valves on suction and discharge side
(4, 6).
7. Loosen screws (7) on the dosing head (5).
8. Remove the screws, in case of PP or PVDF
dosing head together with the front plate (8).
9. Remove the dosing head (5).
10. Unscrew diaphragm (3) counter-clockwise and
remove it.
11. Make sure the drain opening (9) is not blocked or
soiled. Clean if necessary.
12. Check the safety diaphragm (1) for wear and
damage.
If nothing indicates that dosing liquid has entered the
pump housing, and if the safety diaphragm is not
worn or damaged, go on as described in section
9.3.3 Reassembling the diaphragm and
Otherwise proceed as described in section
9.4.1 Dosing liquid in the pump
9.4 Diaphragm
valves.
housing.
33

Publicidad

Tabla de contenido
loading

Tabla de contenido