Dimensions; Installation; Safety Instructions; Installation Environment - Grundfos DME Serie Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.4 Dimensions

See dimensions at the end of these instructions.
All dimensions are in inches (mm).

5. Installation

5.1 Safety instructions

Liquid is under pressure and may be hazardous.
When working with chemicals, local safety rules
and regulations must be observed
(e.g. wear protective clothes).
Before starting work on the dosing pump and
system, disconnect the electricity supply to the
pump, ensuring that it cannot be accidentally
switched on. Before reconnecting the electricity
supply, make sure that the dosing hose is
positioned in such a way that any chemical left in
the dosing head is not ejected, thereby exposing
persons to danger.
If the vent valve in the dosing head is used, it
must be connected to a hose which is led back to
the tank.
When changing a chemical, make sure that the
materials of the dosing pump and system are
resistant to the new chemical. If there is any risk
of chemical reaction between the two types of
chemicals, clean the pump and system
thoroughly before adding the new chemical.
Proceed as follows:
Place the suction tube in water and press the
button until residual chemical has been
100%
removed.
Note: When the buttons
simultaneously, the pump can be set to run for a
specific number of seconds at maximum
capacity. The remaining number of seconds will
appear in the display. The maximum value is
300 seconds.

5.2 Installation environment

Exposure to direct sunlight should be avoided.
This applies especially to pumps with plastic
dosing heads, as this material can be damaged
by sunlight.
If the pump is installed outside, an enclosure or
similar protection is required to protect the pump
against rain and similar weather.
10
and
are pressed
100%

5.3 Installation of pump

See also the installation example in section
5.4 Installation
example.
The dosing head may contain water
from the factory test. If a liquid which
must not come into contact with water
Caution
is to be dosed, it is recommended to let
the pump run with another liquid to
remove the water from the dosing head
before installation.
Cross-tighten the dosing head screws
with a torque wrench once before
Caution
commissioning and again after 2-5
operating hours at torque 4.06 ft·lb
(+0.37/-0 ft·lb) (5.5 Nm (+0.5/-0 Nm)).
Always install the pump on the supporting foot
with vertical suction and discharge ports.
Always use suitable tools for the mounting of
plastic parts. Never apply unnecessary force.
Make sure that the dosing pump and system are
designed in such a way that neither system
equipment nor buildings are damaged in case of
leakage from the pump or rupture of hoses/pipes.
The installation of leakage hoses and collecting
tanks is recommended.
Make sure that the drain hole in the dosing head
points downwards, see fig. 1.
Never attach a hose to the drain
Caution
opening.
Fig. 1
Drain hole

Publicidad

Tabla de contenido
loading

Tabla de contenido