EB TECHNOLOGY START-S3XL-K Manual De Instrucciones página 24

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

START-S3XL-K
2.10
Connection of the
Without TEST
8
9 10 11 12 13 14 15 16 17 18 19
RX
NC Contact
2.11
Connection of the
Without TEST
8
9 10 11 12 13 14 15 16 17 18 19
-
RX
NC Contact
The photocell receiver con-
tact must be:
- dry
(insulated from power sup-
ply voltages)
- type N.C.
(Normally closed)
If more than one pair of pho-
tocells is used, they must be
connected in series.
24 Vac
photocell
24 Vac
Put
JUMPER
TX
JAC/DC
as shown in
the picture
AC DC
24 Vdc
photocell
24 Vdc
+
Put
TX
JUMPER
JAC/DC
as shown in
the picture
AC DC
The photocell TEST ensures that the automation only functions when the pho-
tocells are functioning properly. In fact, the control unit performs the test before
each opening. If there is a photocell malfunction, the control unit turns the fl ashing
lights on for 5 seconds and the automation does not start.
The control unit automatically activates the test only after the START com-
mand times have been learnt. If you wish to return to the LIGHT function
on terminals 20 and 21, the photocells must be connected without the test
and then you must repeat the times learning operation with the START com-
mand.
The TEST function is compatible with lower devices (for example TRANSCEI-
VER) so the gate can have a delay when opening. The TEST can be done also
from some devices in the INPUT COSTA (safety edge) and STOP.
After the TEST connections, memorize the working time for the START control
during this time the control unit check the devices which should are connected to
the TEST.
With TEST
8
9 10 11 12 13 14 15 16 17 18 19
RX
NC Contact
With TEST
8
9 10 11 12 13 14 15 16 17 18 19
-
RX
NC Contact
-8-
24 Vac
!
If the STOP input is NOT
used put the DIP 6 in ON.
24 Vdc
+
Technical Manual
20 21
TX
20 21
TX

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido