Stryker M-1 Manual Del Usuario página 33

Ocultar thumbs Ver también para M-1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 169
Installing the defibrillator platform (Continued)
6.
Place the latch hook (C) under the litter frame or foot end fastener and push the tab (D) up until it locks into place
on one side with an audible click. Repeat on the other side. For Power-LOAD compatible cots, if equipped, you
must lengthen and attach the straps to the foot end fastener
A
Figure 1-19: Raise IV pole and position defibrillator
7.
Make sure that the defibrillator platform is secured to the product.
8.
Place the defibrillator on the defibrillator platform.
9.
Secure the straps (E) to hold the defibrillator on the defibrillator platform
Figure 1-21: Tab
www.stryker.com
Operation
B
tray
6100-109-005 REV B
(Figure 1-21 on page
1-27).
Figure 1-20: Latch hook placement
(Figure 1-22 on page
Figure 1-22: Attach defibrillator platform to the cot
English
EN
1-27).
1-27

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

6100

Tabla de contenido