Audi Wallbox Manual Del Usuario página 29

Ocultar thumbs Ver también para Wallbox:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Color coding for EV charging cable
Wires
L1
L2
Color
Brown
Black
4. Set the DIP-switches.
Caution
A damaged communication board may result
in improper installation and thus cause
unstable wallbox functionality.
› Be careful not to damage the communica-
tion board during DIP-switches configura-
tion.
See chapter Set DIP-switches for the DIP-
switch settings required.
5. Remove cardboard cover.
6. Optionally, connect the RS485 cable.
a. Insert the three wires into the kWh
meter following the color coding below.
Color coding for RS485 cable
Wires
N
Color
White
kWh meter
37 / A
connection
b. Push the cable's connector into the
dedicated port on the communication
board.
7. Optionally, install and connect the Ether-
net cable.
a. Strip the outer insulation of the cable,
then strip and crimp the individual wi-
res to a suitable length for the Ethernet
connector.
b. Mount the Ethernet connector.
c. Connect Ethernet cable to the commu-
nication board.
* For Audi Wallbox plus and Audi Wallbox pro only.
L3
N
PE
Green /
Grey
Blue
Yellow
P
PE
Red
Black
36 / B
35 / C
8. Mount front cover:
a. Connect the HMI cable to the HMI
board.
b. Connect the RFID cable to the HMI
board.*
c. While holding the front cover next to
the main assembly, connect the HMI
cable to the power board.
d. While holding the front cover next to
the main assembly, connect the RFID
cable to the communication board.*
e. Before closing the wallbox, check and
ensure the following:
I.
All cables are connected properly.
II. The communication board is in the
correct position. Check by pressing
on it gently.*
III. The charging cable holder is
aligned with the edges of the main
enclosure.
IV. The rubber seal of the charging ca-
ble and the rubber seal of the front
cover are in the correct position,
clean and not damaged.
V.
There is no risk for the cables to be
trapped between main assembly
and front assembly.
f. Place the front cover onto the main
assembly by using the provided hooks of
the front cover. Mount the front cover by
tightening the six screws M4 x 10 mm.
9. Align the bezel with the UP arrow on the
inside pointing up. Push the bezel onto
the front cover so it locks in position.
10. Wind the charging cable around the
wallbox for proper storage.
11. Turn on the input power of the station.
The wallbox state LED comes on to show
that the wallbox is starting up to become
ready to charge. See chapter Status indica-
tion for more information.
29

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Wallbox plusWallbox pro

Tabla de contenido