Connect Ductwork - Broan Best KER222 Manual Del Usuario

Ocultar thumbs Ver también para Best KER222:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Depth adjustment screws provide
horizontal adjustment.
5. Secure the hood with mounting screws
(4,8x38mm). Use drywall anchors,
provided, if wall studs or framing are not
available.
6. Replace electrical box.
WIRING
Note: This range hood must be properly
grounded. The unit should be installed by a
qualified electrician in accordance with all
applicable national and local electrical
codes.
1. Remove the wiring box cover. Remove a
knockout from the wiring box.
2. Secure the conduit to the wiring box through
a conduit connector.
3. Make electrical connections. Connect white
to white, black to black and green to green or bare wire.
4. Replace wiring box cover and screws. Make sure that wires are not pinched
between cover and box.

CONNECT DUCTWORK

1. Use mounting screws (4,8x38mm) and wall
anchors to secure flue mounting bracket
to the ceiling or wall as shown.
2. Use 8" round metal duct to connect the duct
collar on the hood to the ductwork above.
3. Use duct tape to make all joints secure and
air tight.
4. Adjust the decorative flue to the desired
lenght and tighten screw.
All manuals and user guides at all-guides.com
- 8 -
RECTANGULAR
MOUNTING
SCREWS
(4,8x38mm)
WALL
FRAMING
DEPTH ADJUSTMENT
MOUNTING
SCREWS
SCREWS
(4,8x38mm)
HEIGHT ADJUSTMENT SCREWS
WIRING BOX COVER
DUCT
COLLAR
(4,8x38mm)
CUTOUTS
MOUNTING
BRACKETS
FLUE
MOUNTING
BRACKET
MOUNTING
SCREWS

Publicidad

Tabla de contenido
loading

Tabla de contenido