Electrical Wiring With Valve Seal Control - Riello RS5D Instrucciones De Instalación, Uso Y Mantenimiento

Quemadores de gas con aire soplado
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5.10.2 Electrical wiring with valve seal control

Connect the 2nd stage thermostat (TR) to the terminals T6 and T8 removing the jumper.
Key to layout (Fig. 18)
B5 – Signal 2nd stage operating
h1
– 1st stage hour counter
h2
– 2nd stage hour counter
PG – Min. gas pressure switch
S3 – Remote lock-out signal (230V - 0.5 A max.)
T6A – Fuse
TL
– Limit thermostat
TR – 2nd stage thermostat
TS – Safety thermostat
V10 – Safety valve
V11 – 1st stage valve
V12 – 2nd stage valve
X4 – 4 pin plug
X6 – 6 pin plug
X7 – 7 pin plug
20141174
230V ~ 50Hz
Installation
22
GB
D4371
TO BE DONE BY
BY THE INSTALLER
Fig. 18

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Rs5df

Tabla de contenido